
Hydro ECI has realized these projects :
| Project | Location | Description | Qty | Turbine | Power |
|---|
| Miller Creek Miller Creek Power Ltd |
British Columbia | Engineering for Water To Wire project | 1 1 |
Horizontal Pelton Vertical Pelton |
3 MW 30 MW |
|
| Chats Falls Ontario Power Generation | Ontario | Technical specifications for rehabilitation of control, protection and speed governing | 8 | Kaplan vertical | 23.5 MW | |
| Seven Mile BC Hydro | British Columbia | Blow down control system | 1 | Francis vertical | 213 MW | |
| Januszkowice Egoodra | Poland | Engineering for Water To Wire project | 2 | Kaplan pit | 700 KW | |
| Grand-Mere Hydro-Quebec |
Quebec | Engineering for hydraulic power unit and speed governor | 3 | Kaplan vertical | 76 MW | |
| Outarde-3 Hydro-Quebec |
Quebec | Engineering for hydraulic power unit and speed governor | 4 | Francis vertical | 257 MW | |
| Mountain Chute Ontario Power Generation |
Ontario | Engineering for remote control with a RTU GE Harris | 2 | Francis vertical | 50 MW | |
| Toulnustouc Hydro-Quebec |
Quebec | Engineering and control panel supply for hydraulic power unit | 2 | Francis vertical | 247 MW | |
| Toulnustouc Hydro-Quebec |
Quebec | Engineering for turbine instrumentation | 2 | Francis vertical | 247 MW | |
| Toulnustouc Hydro-Quebec |
Quebec | Engineering and control panel supply for turbine inlet valve | 2 | Francis vertical | 247 MW | |
| Sonoco-Glen Miller Innergex |
Quebec | Engineering for Water To Wire project and control-protection equipments | 2 | Kaplan type ECOBulb | 4000 KW | |
| Rapide-des-Cedres Great Lakes Power |
Quebec | Engineering for Water To Wire project and control-protection equipments | 2 | Kaplan | 4985 KW | |
| Toulnustouc Hydro-Quebec |
Quebec | Assembly of speed governor cabinet | 2 | Francis vertical | 247 MW | |
| Barrage Aylmer | Quebec | Sluice Gates control and automation | 5 | N/A | N/A | |
| Rapides-des-Coeurs et Chute Allard Hydro-Quebec |
Quebec | Supply of speed governor cabinet and engineering and control panel supply for hydraulic power unit | 6 6 |
Kaplan type Saxo Kaplan type Saxo |
14500 KW 11500 KW |
|
| La Tuque Hydro-Quebec |
Quebec | Assembly of speed governor cabinet. Engineering and control panel supply for hydraulic power unit. | 3 | Francis vertical | 60 MW | |
| Magpie HydroMega |
Quebec | Engineering for Water To Wire project and associated electrical equipments | 3 | Kaplan type Saxo | 12600 KW | |
| Vernon Units 5-8 TransCanada Northeast |
Vermont | Engineering for Water To Wire project and associated electrical equipments | 4 | Kaplan type Saxo | 4500 KW | |
| Umbata Falls Innergex |
Ontario | Engineering for Water To Wire project and associated electrical equipments | 2 | Kaplan horizontal | 11970 KW | |
| Chute Allard Hydro-Quebec |
Quebec | Control panel for rubber dam | 2 | N/A | N/A | |
| Aberfeldie BC Hydro |
British Columbia | Engineering for Water To Wire project and associated electrical equipments | 3 | Francis horizontal | 8300 KW | |
| Rapides-des-Coeurs et Chute Allard Hydro-Quebec |
Quebec | Supply of control panel for water filtration system and electrical equipments for the generator | 6 6 |
Kaplan type Saxo Kaplan type Saxo |
14500 KW 11500 KW |
|
| Trent Rapids Trent Rapids Corp |
Ontario | Engineering for Water To Wire project and associated electrical equipments | 2 | Kaplan type ECOBulb | 4000 KW | |
| Ashlu Creek Innergex |
British Columbia | Engineering for Water To Wire project and associated electrical equipmentsn | 3 | Francis horizontal | 18000 KW | |
| Eastmain 1A Hydro-Quebec |
Quebec | Assembly of speed governor cabinet. Engineering and control panel supply for hydraulic power unit | 3 | Francis vertical | 277 MW | |
| Bersimis 2 Hydro-Quebec |
Quebec | Assembly of speed governor cabinet. Engineering and control panel supply for hydraulic power unit | 5 | Francis vertical | 169 MW | |
| Madawaska City of Edmunston |
New-Brunswick | Engineering for Water To Wire project and associated electrical equipments | 1 | Kaplan | 4200 KW | |
| Aishihik Yukon Energy |
Yukon | Engineering and electrical equipments for the generator | 1 | Francis | 7000 KW | |
| Franquelin Axor |
Quebec | Engineering for Water To Wire project. Control and protection cabinets and station service equipments | 1 | Francis double runner | 10600 KW | |
| Marmora Shaman Power Corporation |
Ontario | SCADA rehabilitation 2 x 700Hp | 1 | Not applicable | Not applicable | |
| Kapuskasing HydroMéga |
Ontario | Engineering for Water To Wire project and associated electrical equipments | 8 | Kaplan horizontal | 2750 KW | |
| Brandon Road Northern Illinois Hydro |
Illinois | Engineering for Water To Wire project and associated electrical equipments | 2 | Kaplan pit turbine double regulated | 5314 KW | |
| Dresden Island Northern Illinois Hydro |
Illinois | Engineering for Water To Wire project and associated electrical equipments | 3 | Kaplan pit turbine double regulated | 3477 KW | |
| Sheldrake Axor |
Quebec | Engineering and control panels with protection and electrical distribution system | 2 | Francis double runner | 12500 KW |